Project Details
This page displays current information for project DEA: 112T1824.
Project Information
Project Identifiers | Project ID: 7780 DEA: 112T1824 EFIS: 1100020051 |
---|---|
DIST-CO-RTE-PM | 11-SD-805-4.7/5.6 |
Award Date | 01/03/2013 |
Closeout Date | 09/07/2018 |
Work Description | REPLACE STRUCTURE AND CONSTRUCT DIRECT ACCESS RAMP (DAR). |
Location Description | SAN DIEGO COUNTY IN CHULA VISTA FROM 0.4 MILE SOUTH OF EAST PALOMAR STREET OVERCROSSING TO 0.1 MILE NORTH OF NAPLES STREET UNDERCROSSING |
QA Service Level | 1 (Verified on 12/10/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
No results found. |
Samples
Samples submitted for this project.
Displaying 851-860 of 989 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2013-10-17-23007642 | 10/17/2013 | 10/22/2013 | Quality Control | Concrete | View |
2013-10-17-23106839 | 10/17/2013 | Verification | Concrete | View | |
2013-10-17-22587221 | 10/17/2013 | 11/13/2013 | Verification | Concrete | View |
2013-10-16-7150985 | 10/16/2013 | Quality Control | Concrete | View | |
2013-10-16-8308150 | 10/16/2013 | Quality Control | Concrete | View | |
2013-10-16-6457071 | 10/16/2013 | 10/16/2013 | Quality Control | Aggregate | View |
2013-10-16-6452650 | 10/16/2013 | 10/16/2013 | Quality Control | Aggregate | View |
2013-10-11-6308041 | 10/11/2013 | 10/11/2013 | Quality Control | Aggregate | View |
2013-10-11-6306887 | 10/11/2013 | 10/11/2013 | Quality Control | Aggregate | View |
2013-10-11-7302367 | 10/11/2013 | 10/14/2013 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods