Project Details
This page displays current information for project DEA: 071218W4.
Project Information
Project Identifiers | Project ID: 7613 DEA: 071218W4 EFIS: 0700021119 |
---|---|
DIST-CO-RTE-PM | 07-LA-5-29.4/31.6 |
Award Date | 11/29/2012 |
Closeout Date | 07/31/2023 |
Work Description | REALIGN ROUTE 5 AND RAILROAD TRACKS AND RECONFIGURE ON- AND OFF-RAMPS. |
Location Description | LOS ANGELES COUNTY IN BURBANK FROM WEST MAGNOLIA BOULEVARD OVERCROSSING TO 0.3 MILE NORTH OF BUENA VISTA STREET/WINONA AVENUE UNDERCROSSING |
QA Service Level | 1 (Verified on 10/08/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
gchoi@prescienceusa.com | Gon Choi | Structural Representative | Caltrans SR DB |
jeffrey.yu@dot.ca.gov | Jeffrey Yu | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 171-180 of 317 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2015-10-15-7 | 10/15/2015 | 10/20/2015 | Quality Control | Concrete | View |
2015-10-15-8 | 10/15/2015 | 10/21/2015 | Quality Control | Concrete | View |
2015-10-23-6 | 10/23/2015 | 10/27/2015 | Quality Control | Concrete | View |
2015-10-23-7 | 10/23/2015 | 10/27/2015 | Quality Control | Concrete | View |
2015-10-23-8 | 10/23/2015 | 10/27/2015 | Quality Control | Concrete | View |
2015-10-26-1 | 10/26/2015 | 10/29/2015 | Quality Control | Concrete | View |
2015-10-26-2 | 10/26/2015 | 10/26/2015 | Quality Control | Concrete | View |
2015-10-28-2 | 10/28/2015 | 10/30/2015 | Quality Control | Concrete | View |
2015-11-03-5 | 11/03/2015 | 11/09/2015 | Quality Control | Concrete | View |
2015-11-13-4 | 11/13/2015 | 11/18/2015 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods