Project Details
This page displays current information for project DEA: 071218W4.
Project Information
Project Identifiers | Project ID: 7613 DEA: 071218W4 EFIS: 0700021119 |
---|---|
DIST-CO-RTE-PM | 07-LA-5-29.4/31.6 |
Award Date | 11/29/2012 |
Closeout Date | 07/31/2023 |
Work Description | REALIGN ROUTE 5 AND RAILROAD TRACKS AND RECONFIGURE ON- AND OFF-RAMPS. |
Location Description | LOS ANGELES COUNTY IN BURBANK FROM WEST MAGNOLIA BOULEVARD OVERCROSSING TO 0.3 MILE NORTH OF BUENA VISTA STREET/WINONA AVENUE UNDERCROSSING |
QA Service Level | 1 (Verified on 10/08/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
gchoi@prescienceusa.com | Gon Choi | Structural Representative | Caltrans SR DB |
jeffrey.yu@dot.ca.gov | Jeffrey Yu | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 317 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-11-01-7 | 11/01/2021 | 11/04/2021 | Verification | Aggregate | View |
2021-11-03-21 | 11/03/2021 | 11/05/2021 | Verification | Aggregate | View |
2021-11-13-5 | 11/13/2021 | 11/16/2021 | Verification | Aggregate | View |
2021-11-13-6 | 11/13/2021 | 11/16/2021 | Verification | Crumb Rubber Modifier | View |
2021-11-13-7 | 11/13/2021 | 11/16/2021 | Verification | Crumb Rubber Modifier | View |
2022-02-24-31 | 02/24/2022 | 02/28/2022 | Verification | Aggregate | View |
2015-03-04-7 | 03/04/2015 | 03/12/2015 | Quality Control | Concrete | View |
2015-03-11-3 | 03/11/2015 | 03/16/2015 | Quality Control | Concrete | View |
2015-03-11-4 | 03/11/2015 | 03/16/2015 | Quality Control | Concrete | View |
2015-03-23-2 | 03/23/2015 | 03/27/2015 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods