This page displays current information for project DEA: 042332C4.
Project Information
Project Identifiers | Project ID: 7598 DEA: 042332C4 EFIS: 0400000668 COOP: 042346 Permit Numbers: 0412NDP1301 0412NMC0521 0412NRD1458 0412NRD0731 |
---|---|
DIST-CO-RTE-PM | 04-ALA-262-0/0.5 |
Award Date | 04/04/2012 |
Closeout Date | 06/03/2015 |
Work Description | Phase 1B of the 1-880/mission Boulevard improvements includes:The demolition of two single-track freight rail bridges; |
Location Description | Warm Springs Blvd, Fremont |
QA Service Level | 1 (Verified on 12/12/2012) |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods