Project Details
This page displays current information for project DEA: 103A1004.
Project Information
Project Identifiers | Project ID: 7547 DEA: 103A1004 EFIS: 1000000409 |
---|---|
DIST-CO-RTE-PM | 10-SJ-4,99-R19.5/R20.1,15.0/18.6 |
Award Date | 10/16/2012 |
Closeout Date | 09/21/2018 |
Work Description | WIDEN FREEWAY, CONSTRUCT BRIDGES, PUMP PLANTS AND INTERCHANGES. |
Location Description | SAN JOAQUIN COUNTY IN AND NEAR STOCKTON ON ROUTE 4 FROM ADELBERT AVENUE TO 0.1 MILE WEST OF GOLDEN GATE AVENUE OVERCROSSING AND ON ROUTE 99 FROM 0.4 MILE NORTH OF ARCH ROAD UNDERCROSSING TO 0.1 MILE SOUTH OF ROUTE 4 WEST/99 NORTH CONNECTOR OVERCROSSING |
QA Service Level | 1 (Verified on 12/10/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
troy.scheiber@dot.ca.gov | Troy Scheiber | Resident Engineer | Caltrans RE DB |
chau.ha@dot.ca.gov | Chau Ha | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-3 of 3 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2015-02-05-1 | 02/05/2015 | 04/20/2022 | Verification | Concrete | View |
2015-10-05-1 | 10/05/2015 | 10/07/2015 | Verification | Concrete | View |
2017-12-04-2 | 12/04/2017 | 12/04/2017 | Quality Assurance | Thermoplastic | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods