Project Details
This page displays current information for project DEA: 042908C4.
Project Information
Project Identifiers | Project ID: 7531 DEA: 042908C4 EFIS: 0400021248 COOP: 042397A3 |
---|---|
DIST-CO-RTE-PM | 04-ALA-580-R8.4/R14.6 |
Award Date | 11/20/2012 |
Closeout Date | 09/30/2016 |
Work Description | ROADWAY WIDENING AND REHABILITATION. |
Location Description | ALAMEDA COUNTY IN LIVERMORE FROM 0.1 MILE WEST OF GREENVILLE ROAD UNDERCROSSING TO 0.5 MILE WEST OF 84/580 SEPARATION |
QA Service Level | 1 (Verified on 09/24/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
eddie.dike@dot.ca.gov | Eddie Dike | Resident Engineer | Caltrans RE DB |
kharakbir.sandhu@dot.ca.gov | Kharakbir Sandhu | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 26 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2015-02-26-4 | 02/26/2015 | 03/06/2015 | Verification | Concrete | View |
2015-02-25-3 | 02/25/2015 | 03/06/2015 | Verification | Concrete | View |
2015-02-27-7 | 02/27/2015 | 03/06/2015 | Verification | Concrete | View |
2014-10-07-7 | 10/07/2014 | 10/16/2014 | Quality Control | Concrete | View |
2014-09-29-7 | 09/29/2014 | 10/16/2014 | Quality Control | Concrete | View |
2014-12-22-2 | 12/22/2014 | 12/26/2014 | Quality Control | Concrete | View |
2014-12-22-3 | 12/22/2014 | 12/26/2014 | Quality Control | Concrete | View |
2014-12-17-1 | 12/17/2014 | 12/26/2014 | Quality Control | Concrete | View |
2014-12-16-1 | 12/16/2014 | 12/26/2014 | Quality Control | Concrete | View |
2015-01-20-2 | 01/20/2015 | 01/23/2015 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods