Project Details

This page displays current information for project DEA: 04445604.

Project Information

Project IdentifiersProject ID: 7475
DEA: 04445604
EFIS: 0400001081
COOP: 042434
Permit Numbers: 0412NMC0872 0412NDP1643
DIST-CO-RTE-PM04-SCL-280-5.1/5.2,0.0/0.8
Award DateNot set
Closeout Date05/07/2019
Work DescriptionThe work to be performed within STATE highway right-of-way includes the following:-Modify the existing I-880/Stevens creek blvd interchange from full clover to partial clover and diamond configuration, removing existing loop ramps and re-aligning, widening
Location DescriptionIn San Jose on Rte 280 from west of Patton Ave to 0.1 mile east of Rte 280/880 Separation on Rte 880 from, Rte 280/880 Separation to Forest Ave Undercrossing
QA Service Level2 (Verified on 12/11/2012)

Samples

Samples submitted for this project.

Job Mix Formula (JMF)

JMFs associated with this project.
JMF IDStatusSubmitted byDIME Sample IDDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs submitted for this project.
Declaration NumberProgram OperatorMaterial TypeVendorSubmitted by
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods