Project Details

This page displays current information for project EFIS: 0000001155.

Project Information

Project IdentifiersProject ID: 7473
EFIS: 0000001155
Permit Numbers: 0312NSN0037
DIST-CO-RTE-PM03-YOL-128-9.67/9.67
Award Date05/01/2012
Closeout Date04/27/2018
Work DescriptionConstruction of new traffic signal with intersection widening and removal of free-right turn at I-505 SB off-ramp. The project also includes north side pedestrian improvements at the intersection, storm drainage, water and sewer improvements
Location DescriptionHwy 128 (Grant Ave), Winters
QA Service Level2 (Verified on 12/05/2014)

Samples

Samples submitted for this project.

Job Mix Formula (JMF)

JMFs associated with this project.
JMF IDStatusSubmitted byDIME Sample IDDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs submitted for this project.
Declaration NumberProgram OperatorMaterial TypeVendorSubmitted by
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods