Project Details
This page displays current information for project DEA: 043A9214.
Project Information
Project Identifiers | Project ID: 7467 DEA: 043A9214 EFIS: 0412000339 COOP: 042445 |
---|---|
DIST-CO-RTE-PM | 04-ALA-880-22.6/24.0 |
Award Date | 09/14/2012 |
Closeout Date | 09/28/2016 |
Work Description | WIDEN FREEWAY, REPLACE OVERCROSSINGS, AND RECONSTRUCT RAMPS/ROADS. |
Location Description | ALAMEDA COUNTY IN SAN LEANDRO FROM 0.4 MILE SOUTH OF MARINA BOULEVARD OVERCROSSING TO 0.3 MILE NORTH OF ROUTE 112/880 SEPARATION |
QA Service Level | 1 (Verified on 10/05/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Bahadur.N.Singh@dot.ca.gov | Bahadur Singh | Resident Engineer | Caltrans RE DB |
bryan_d_chew@dot.ca.gov | Bryan Chew | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 24 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2015-03-04-5 | 03/04/2015 | 03/09/2015 | Verification | Concrete | View |
2015-03-05-5 | 03/05/2015 | 03/09/2015 | Verification | Concrete | View |
2015-03-04-4 | 03/04/2015 | 03/09/2015 | Verification | Concrete | View |
2015-03-04-3 | 03/04/2015 | 03/09/2015 | Verification | Concrete | View |
2015-03-04-2 | 03/04/2015 | 03/09/2015 | Verification | Concrete | View |
2015-02-10-8 | 02/10/2015 | 03/09/2015 | Verification | Concrete | View |
2015-01-22-4 | 01/22/2015 | 02/09/2015 | Quality Control | Concrete | View |
2015-01-22-3 | 01/22/2015 | 02/09/2015 | Quality Control | Concrete | View |
2015-01-22-2 | 01/22/2015 | 02/09/2015 | Quality Control | Concrete | View |
2015-01-22-1 | 01/22/2015 | 02/09/2015 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods