Project Details
This page displays current information for project DEA: 042640U4.
Project Information
Project Identifiers | Project ID: 7463 DEA: 042640U4 EFIS: 0412000195 |
---|---|
DIST-CO-RTE-PM | 04-SON-101-0.9/3.6 |
Award Date | 11/02/2012 |
Closeout Date | 06/03/2020 |
Work Description | CONSTRUCT PETALUMA BLVD SOUTH INTERCHANGE, REPLACE PETALUMA RIVER BR |
Location Description | SONOMA COUNTY IN AND NEAR PETALUMA FROM GUNN DRIVE TO ROUTE 101/116 SEPARATION AND OVERHEAD |
QA Service Level | 1 (Verified on 09/11/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
richard.duncan@dot.ca.gov | Richard Duncan | Resident Engineer | Caltrans RE DB |
brian.f.beaudoin@dot.ca.gov | Brian Beaudoin | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 139 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2015-12-11-3 | 12/11/2015 | Quality Assurance | Concrete | View | |
2016-03-07-2 | 03/07/2016 | Quality Assurance | Concrete | View | |
2013-10-28-2350 | 10/28/2013 | 10/29/2013 | Verification | Concrete | View |
2013-10-24-1449 | 10/24/2013 | 10/30/2013 | Verification | Concrete | View |
2013-10-22-4417 | 10/22/2013 | 10/30/2013 | Verification | Concrete | View |
2013-11-08-5550 | 11/08/2013 | 12/13/2013 | Verification | Concrete | View |
2013-11-04-8344 | 11/04/2013 | 12/13/2013 | Verification | Concrete | View |
2013-11-15-7500 | 11/15/2013 | 12/13/2013 | Verification | Concrete | View |
2013-11-06-2201 | 11/06/2013 | 12/13/2013 | Verification | Concrete | View |
2014-02-21-10427099 | 02/21/2014 | 02/07/2014 | Annual Source Testing | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods