Project Details
This page displays current information for project DEA: 042640U4.
Project Information
Project Identifiers | Project ID: 7463 DEA: 042640U4 EFIS: 0412000195 |
---|---|
DIST-CO-RTE-PM | 04-SON-101-0.9/3.6 |
Award Date | 11/02/2012 |
Closeout Date | 06/03/2020 |
Work Description | CONSTRUCT PETALUMA BLVD SOUTH INTERCHANGE, REPLACE PETALUMA RIVER BR |
Location Description | SONOMA COUNTY IN AND NEAR PETALUMA FROM GUNN DRIVE TO ROUTE 101/116 SEPARATION AND OVERHEAD |
QA Service Level | 1 (Verified on 09/11/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
richard.duncan@dot.ca.gov | Richard Duncan | Resident Engineer | Caltrans RE DB |
brian.f.beaudoin@dot.ca.gov | Brian Beaudoin | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 41-50 of 139 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2014-10-21-1 | 10/21/2014 | 11/07/2014 | Quality Control | Concrete | View |
2015-02-24-2 | 02/24/2015 | 02/27/2015 | Quality Control | Concrete | View |
2015-02-24-3 | 02/24/2015 | 02/24/2015 | Quality Control | Concrete | View |
2015-02-26-1 | 02/26/2015 | 02/27/2015 | Quality Control | Concrete | View |
2015-02-26-2 | 02/26/2015 | 02/27/2015 | Quality Control | Concrete | View |
2015-03-09-4 | 03/09/2015 | 03/12/2015 | Quality Control | Concrete | View |
2015-03-09-5 | 03/09/2015 | 03/12/2015 | Quality Control | Concrete | View |
2015-03-10-6 | 03/10/2015 | 03/12/2015 | Quality Control | Concrete | View |
2015-03-10-7 | 03/10/2015 | 03/12/2015 | Quality Control | Concrete | View |
2015-03-13-8 | 03/13/2015 | 03/27/2015 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods