Project Details
This page displays current information for project DEA: 042640U4.
Project Information
Project Identifiers | Project ID: 7463 DEA: 042640U4 EFIS: 0412000195 |
---|---|
DIST-CO-RTE-PM | 04-SON-101-0.9/3.6 |
Award Date | 11/02/2012 |
Closeout Date | 06/03/2020 |
Work Description | CONSTRUCT PETALUMA BLVD SOUTH INTERCHANGE, REPLACE PETALUMA RIVER BR |
Location Description | SONOMA COUNTY IN AND NEAR PETALUMA FROM GUNN DRIVE TO ROUTE 101/116 SEPARATION AND OVERHEAD |
QA Service Level | 1 (Verified on 09/11/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
richard.duncan@dot.ca.gov | Richard Duncan | Resident Engineer | Caltrans RE DB |
brian.f.beaudoin@dot.ca.gov | Brian Beaudoin | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 31-40 of 139 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2014-09-22-7 | 09/22/2014 | 10/06/2014 | Verification | Concrete | View |
2014-09-26-2 | 09/26/2014 | 10/06/2014 | Verification | Concrete | View |
2014-09-24-2 | 09/24/2014 | 10/06/2014 | Verification | Concrete | View |
2014-10-07-9 | 10/07/2014 | 10/24/2014 | Quality Control | Concrete | View |
2014-10-07-10 | 10/07/2014 | 10/24/2014 | Quality Control | Concrete | View |
2014-10-07-11 | 10/07/2014 | 10/24/2014 | Quality Control | Concrete | View |
2014-10-08-2 | 10/08/2014 | 10/24/2014 | Quality Control | Concrete | View |
2014-10-08-3 | 10/08/2014 | 10/24/2014 | Quality Control | Concrete | View |
2014-10-15-1 | 10/15/2014 | 10/24/2014 | Quality Control | Concrete | View |
2014-10-01-11 | 10/01/2014 | 10/24/2014 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods