Project Details
This page displays current information for project DEA: 07215944.
Project Information
Project Identifiers | Project ID: 7428 DEA: 07215944 EFIS: 0700001834 |
---|---|
DIST-CO-RTE-PM | 07-LA-5-4.0/5.9 |
Award Date | 08/23/2012 |
Closeout Date | 07/02/2021 |
Work Description | RECONSTRUCT AND WIDEN FREEWAY AND UNDERCROSSING STRUCTURES. |
Location Description | LOS ANGELES COUNTY IN NORWALK FROM 0.4 MILE SOUTH OF SAN ANTONIO DRIVE UNDERCROSSING TO 0.7 MILE NORTH OF PIONEER BOULEVARD UNDERCROSSING |
QA Service Level | 1 (Verified on 11/07/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Jerome.g.arabe@dot.ca.gov | Jerome Arabe | Resident Engineer | Caltrans RE DB |
amare.tsegie@dot.ca.gov | Amare Tsegie | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 47 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2014-05-13-14002074 | 05/13/2014 | 05/21/2014 | Department Acceptance | Soil | View |
2014-03-06-6306702 | 03/06/2014 | 03/06/2014 | Preliminary | Soil | View |
2014-10-05-1 | 10/05/2014 | 10/07/2014 | Department Acceptance | Soil | View |
2014-10-29-7 | 10/29/2014 | 10/30/2014 | Department Acceptance | Soil | View |
2014-11-05-16 | 11/05/2014 | 11/06/2014 | Department Acceptance | Soil | View |
2017-04-20-3 | 04/20/2017 | 04/24/2017 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2017-04-20-4 | 04/20/2017 | 04/24/2017 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2017-05-15-7 | 05/15/2017 | 05/17/2017 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2017-06-05-1 | 06/05/2017 | 06/07/2017 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2017-06-05-3 | 06/05/2017 | 06/07/2017 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods