Project Details
This page displays current information for project DEA: 07215944.
Project Information
Project Identifiers | Project ID: 7428 DEA: 07215944 EFIS: 0700001834 |
---|---|
DIST-CO-RTE-PM | 07-LA-5-4.0/5.9 |
Award Date | 08/23/2012 |
Closeout Date | 07/02/2021 |
Work Description | RECONSTRUCT AND WIDEN FREEWAY AND UNDERCROSSING STRUCTURES. |
Location Description | LOS ANGELES COUNTY IN NORWALK FROM 0.4 MILE SOUTH OF SAN ANTONIO DRIVE UNDERCROSSING TO 0.7 MILE NORTH OF PIONEER BOULEVARD UNDERCROSSING |
QA Service Level | 1 (Verified on 11/07/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Jerome.g.arabe@dot.ca.gov | Jerome Arabe | Resident Engineer | Caltrans RE DB |
amare.tsegie@dot.ca.gov | Amare Tsegie | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 21-30 of 47 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2017-04-27-7 | 04/27/2017 | 04/28/2017 | Quality Control | Concrete | View |
2017-05-15-7 | 05/15/2017 | 05/17/2017 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2017-06-05-1 | 06/05/2017 | 06/07/2017 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2017-06-05-3 | 06/05/2017 | 06/07/2017 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2017-06-20-4 | 06/20/2017 | 06/22/2017 | Quality Assurance | SMTL TM5 - Couplers | View |
2017-07-18-2 | 07/18/2017 | 07/18/2017 | Quality Assurance | SMTL TM4 - Prestressing Strand | View |
2017-07-18-3 | 07/18/2017 | 07/18/2017 | Quality Assurance | SMTL TM4 - Prestressing Strand | View |
2017-07-18-4 | 07/18/2017 | 07/18/2017 | Quality Assurance | SMTL TM4 - Prestressing Strand | View |
2017-07-18-6 | 07/18/2017 | 07/18/2017 | Quality Assurance | SMTL TM4 - Prestressing Strand | View |
2017-07-17-3 | 07/17/2017 | 07/19/2017 | Quality Assurance | SMTL TM5 - Couplers | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods