Project Details
This page displays current information for project DEA: 07215934.
Project Information
Project Identifiers | Project ID: 7427 DEA: 07215934 EFIS: 0700001833 |
---|---|
DIST-CO-RTE-PM | 07-LA-5-2.4/4.0 |
Award Date | 08/14/2012 |
Closeout Date | 02/20/2020 |
Work Description | Widen and Realign Freeway and Construct Ped OC, OC and UC Structures. |
Location Description | LOS ANGELES COUNTY IN SANTA FE SPRINGS AND NORWALK FROM 0.1 MILE NORTH OF CARMENITA ROAD OVERCROSSING TO 0.1 MILE NORTH OF SILVERBOW AVENUE PEDESTRIAN OVERCROSSING |
QA Service Level | 1 (Verified on 11/26/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Mashhur.Ali@dot.ca.gov | Mashhur Ali | Resident Engineer | Caltrans RE DB |
Steven.Kim@dot.ca.gov | Steven Kim | Structural Representative | Caltrans SR DB |
jeffrey.yu@dot.ca.gov | Jeffrey Yu | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 31-40 of 40 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2016-02-17-7 | 02/17/2016 | 02/19/2016 | Annual Source Testing | Aggregate | View |
2016-05-09-6 | 05/09/2016 | 05/10/2016 | Annual Source Testing | Aggregate | View |
2016-05-09-7 | 05/09/2016 | 05/10/2016 | Annual Source Testing | Aggregate | View |
2016-05-09-8 | 05/09/2016 | 05/10/2016 | Annual Source Testing | Aggregate | View |
2016-05-09-9 | 05/09/2016 | 05/10/2016 | Annual Source Testing | Aggregate | View |
2016-08-19-10 | 08/19/2016 | 08/25/2016 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2016-09-07-4 | 09/07/2016 | 09/09/2016 | Quality Control | Concrete | View |
2017-01-11-1 | 01/11/2017 | 01/13/2017 | Retest | SMTL TM4 - Prestressing Strand | View |
2017-01-25-7 | 01/25/2017 | 01/31/2017 | Quality Assurance | SMTL TM5 - Threaded Bar | View |
2017-10-24-2 | 10/24/2017 | 10/27/2017 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods