Project Details

This page displays current information for project DEA: 07245403.

Project Information

Project IdentifiersProject ID: 7409
DEA: 07245403
EFIS: 0700000431
DIST-CO-RTE-PM07-LA-10-31.1/32.3
Award Date02/29/2012
Closeout Date10/27/2016
Work DescriptionConstruct Connector between I-10 and I-605 (Design Build Project) LA-10-31.1/32.3, LA-605-R20.2/20.6
Location Description10 & 605 IC
QA Service Level1 (Verified on 03/14/2013)

Samples

Samples submitted for this project.
Displaying 1-10 of 16 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
2015-10-06-410/06/201510/08/2015Quality ControlConcreteView
2015-06-11-206/11/201506/15/2015Quality ControlConcreteView
2015-05-22-105/22/201505/26/2015Quality ControlConcreteView
2015-05-20-105/20/201505/20/2015Quality ControlConcreteView
2015-05-19-205/19/201505/20/2015Quality ControlConcreteView
2015-04-27-104/27/201504/01/2015Quality ControlConcreteView
2015-04-24-104/24/201504/28/2015Quality ControlConcreteView
2015-04-23-104/23/201504/23/2015Quality ControlConcreteView
2015-04-16-504/16/201504/20/2015Quality ControlConcreteView
2015-04-16-604/16/201504/20/2015Quality ControlConcreteView

Job Mix Formula (JMF)

JMFs associated with this project.
JMF IDStatusSubmitted byDIME Sample IDDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs submitted for this project.
Declaration NumberProgram OperatorMaterial TypeVendorSubmitted by
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods