Project Details
This page displays current information for project DEA: 040120T4.
Project Information
| Project Identifiers | Project ID: 7285 DEA: 040120T4 EFIS: 0400000027 |
|---|---|
| DIST-CO-RTE-PM | 04-SF-80-12.6/13.9 |
| Award Date | 11/27/2012 |
| Closeout Date | 02/12/2025 |
| Work Description | CONSTRUCT BRIDGE, ROADWAYS, ELECTRICAL, BUILDINGS AND REMOVE BRIDGES |
| Location Description | THE CITY AND COUNTY OF SAN FRANCISCO FROM THE YERBA BUENA TUNNEL TO 1.3 KM EAST OF THE YERBA BUENA TUNNEL |
| QA Service Level | 1 (Verified on 10/29/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| thomas.larwin@dot.ca.gov | Tom Larwin | Resident Engineer | Caltrans RE DB |
| mehran_ardakanian@dot.ca.gov | Mehran Ardakanian | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 121-130 of 154 results.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| 2016-07-28-10 | 07/28/2016 | 09/01/2016 | Verification | Concrete | View |
| 2016-07-27-5 | 07/27/2016 | 09/20/2016 | Verification | Concrete | View |
| 2016-08-19-17 | 08/19/2016 | 09/20/2016 | Verification | Concrete | View |
| 2016-09-06-11 | 09/06/2016 | 09/20/2016 | Verification | Concrete | View |
| 2016-11-04-3 | 11/04/2016 | 11/09/2016 | Quality Assurance | SMTL TM5 - Headed Bars | View |
| 2016-11-03-6 | 11/03/2016 | 11/10/2016 | Verification | Concrete | View |
| 2016-10-12-15 | 10/12/2016 | 11/10/2016 | Verification | Concrete | View |
| 2016-09-21-14 | 09/21/2016 | 11/10/2016 | Verification | Concrete | View |
| 2016-10-14-9 | 10/14/2016 | 11/10/2016 | Verification | Concrete | View |
| 2016-11-03-12 | 11/03/2016 | 11/10/2016 | Verification | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
