Project Details
This page displays current information for project DEA: 040120T4.
Project Information
Project Identifiers | Project ID: 7285 DEA: 040120T4 EFIS: 0400000027 |
---|---|
DIST-CO-RTE-PM | 04-SF-80-12.6/13.9 |
Award Date | 11/27/2012 |
Closeout Date | Not set |
Work Description | CONSTRUCT BRIDGE, ROADWAYS, ELECTRICAL, BUILDINGS AND REMOVE BRIDGES |
Location Description | THE CITY AND COUNTY OF SAN FRANCISCO FROM THE YERBA BUENA TUNNEL TO 1.3 KM EAST OF THE YERBA BUENA TUNNEL |
QA Service Level | 1 (Verified on 10/29/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
thomas.larwin@dot.ca.gov | Tom Larwin | Resident Engineer | Caltrans RE DB |
mehran_ardakanian@dot.ca.gov | Mehran Ardakanian | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 91-100 of 154 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2016-01-28-2 | 01/28/2016 | 02/03/2016 | Quality Assurance | Concrete | View |
2016-01-28-3 | 01/28/2016 | 02/04/2016 | Quality Assurance | Concrete | View |
2016-01-14-1 | 01/14/2016 | 02/04/2016 | Quality Assurance | Concrete | View |
2016-01-08-5 | 01/08/2016 | 02/04/2016 | Quality Assurance | Concrete | View |
2016-02-05-1 | 02/05/2016 | 02/05/2016 | Verification | Concrete | View |
2016-03-02-2 | 03/02/2016 | 03/08/2016 | Verification | Concrete | View |
2016-03-04-2 | 03/04/2016 | 03/08/2016 | Verification | Concrete | View |
2016-02-16-4 | 02/16/2016 | 03/08/2016 | Verification | Concrete | View |
2016-03-15-4 | 03/15/2016 | 03/17/2016 | Quality Assurance | Concrete | View |
2016-04-04-7 | 04/04/2016 | 04/21/2016 | Verification | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods