Project Details
This page displays current information for project DEA: 041637U3.
Project Information
Project Identifiers | Project ID: 6928 DEA: 041637U3 EFIS: 0400020166 |
---|---|
DIST-CO-RTE-PM | 04-SF-101-8.2/9.8, 6.9/7.1 |
Award Date | Not set |
Closeout Date | 07/12/2019 |
Work Description | P3 project, Doyle Drive Phase 2, Remaining elements of Presidio Parkway, including NB Presidio Viaduct and Battery Tunnel, Main Post Tunnels, and new Girard Road Interchange w/direct connection to the Presidio. |
Location Description | San Francisco Presidio, Southern approach to Golden Gate Bridge |
QA Service Level | 2 (Verified on 02/07/2013) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
john.f.walters@dot.ca.gov | John Walters | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-1 of 1 result.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-12-05-19 | 12/05/2023 | 12/13/2023 | Acceptance | Roadway/Bridge Surface | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods