Project Details
This page displays current information for project DEA: 112T0404.
Project Information
Project Identifiers | Project ID: 6281 DEA: 112T0404 EFIS: 1100000446 |
---|---|
DIST-CO-RTE-PM | 11-SD-5,805-R49.9/R51.7,42.6/46.5 |
Award Date | 01/28/2011 |
Closeout Date | 07/07/2015 |
Work Description | CONSTRUCT HOV LANES AND DIRECT ACCESS RAMP. |
Location Description | SAN DIEGO COUNTY IN SAN DIEGO ON ROUTE 805 FROM 0.3 KM SOUTH OF SOLEDAD CANYON BRIDGE AND OVERHEAD TO 0.6 KM NORTH OF ROUTE 5/805 SEPARATION AND ON ROUTE 5 FROM 0.6 KM NORTH OF ROUTE 5/805 SEPARATION TO 0.5 KM NORTH OF CARMEL MOUNTAIN ROAD UNDERCROSSING. |
QA Service Level | 1 (Verified on 12/20/2010) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
dave.pound@dot.ca.gov | DAVE POUND | Resident Engineer | Caltrans RE DB |
ron.fuentes@dot.ca.gov | Ron Fuentes | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods