Project Details
This page displays current information for project DEA: 100S2804.
Project Information
| Project Identifiers | Project ID: 5750 DEA: 100S2804 |
|---|---|
| DIST-CO-RTE-PM | 10-SJ-5-R13.8/25.4 |
| Award Date | 05/09/2008 |
| Closeout Date | 11/23/2009 |
| Work Description | RESURFACE HIGHWAY W/ RUBBERIZED HOT MIX |
| Location Description | San Joaquin County in and near Lathrop and Stockton from Paradise Cut Overflow Bridge to Route 5/4 Separation. |
| QA Service Level | 1 (Verified on 12/07/2009) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
| Email Address | Full Name | Role | Personnel Source |
|---|---|---|---|
| mario.castillo@dot.ca.gov | MARIO CASTILLO | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
| DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Job Mix Formula (JMF)
JMFs associated with this project.
| JMF ID | Status | Submitted By | Created By | Date Created | Link |
|---|---|---|---|---|---|
| No results found. | |||||
Precast Concrete Forms
| Project DEA | DIME Sample ID | Sample Taken Date | Link |
|---|---|---|---|
| No results found. | |||
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods
