Project Details
This page displays current information for project DEA: 022E2204.
Project Information
Project Identifiers | Project ID: 424 DEA: 022E2204 Permit Numbers: 0210NSN0224 |
---|---|
DIST-CO-RTE-PM | 02-SHA-273-14.34/14.6 |
Award Date | 04/15/2010 |
Closeout Date | 05/17/2011 |
Work Description | Construct roadway improvements, including traffic signal relocation and upgrades, signal maintenance pull-out, drainage modifications, metal beam guard rail replacement, AC overlay and new pavement delineation, between post miles 14.34 and 14.60 on State |
Location Description | State Route 273, Redding |
QA Service Level | NOT VERIFIED |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
john.hart@dot.ca.gov | John Hart | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods