Project Details
This page displays current information for project DEA: 07293304.
Project Information
Project Identifiers | Project ID: 4086 DEA: 07293304 |
---|---|
DIST-CO-RTE-PM | 07-LA-5-17.2 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | CONSTRUCT SLOPE PAVING WITH COBBLESTONE AT NORTH ABUTMENT OF HOLLENBECK LAKE BRIDGE ON RTE 5 |
Location Description | |
QA Service Level | 1 (Verified on 12/17/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
julien.atallah@dot.ca.gov | Julien Atallah | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-2 of 2 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-02-22-22 | 02/22/2022 | 02/27/2022 | Aggregate Prequalification Program | Aggregate | View |
2022-02-22-23 | 02/22/2022 | 03/01/2022 | Aggregate Prequalification Program | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods