Project Details
This page displays current information for project DEA: 07260704.
Project Information
Project Identifiers | Project ID: 4069 DEA: 07260704 EFIS: 0700000490 |
---|---|
DIST-CO-RTE-PM | 07-VEN,SB-101-R39.8/R43.6,0.0/2.2 |
Award Date | 01/03/2012 |
Closeout Date | 08/24/2017 |
Work Description | WIDEN RDWY WITH JPCP OVER LCB, WIDEN BR UC, CONST PED UC & RET WALLS. |
Location Description | VENTURA AND SANTA BARBARA COUNTIES FROM MOBILE PIER UNDER CROSSING TO 0.4 MILE SOUTH OF CASITAS PASS ROAD |
QA Service Level | 1 (Verified on 03/05/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
hector.arroyo@dot.ca.gov | Hector Arroyo | Resident Engineer | Caltrans RE DB |
aziz@goanalyzer.com | Aziz Maghsoudloo | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-2 of 2 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2014-09-24-1 | 09/24/2014 | 09/24/2014 | Annual Source Testing | Aggregate | View |
2013-09-27-7583 | 09/27/2013 | 09/27/2013 | Annual Source Testing | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods