Project Details
This page displays current information for project DEA: 07138204.
Project Information
Project Identifiers | Project ID: 3825 DEA: 07138204 EFIS: 0700000142 |
---|---|
DIST-CO-RTE-PM | 07-LA-47,103-3.5/4.6,0.0/1.1 |
Award Date | 06/30/2011 |
Closeout Date | 07/14/2022 |
Work Description | REPLACE STEEL BRIDGE WITH CIP PS CONCRETE BOX GIRDER BRIDGE AND RAMPS. |
Location Description | LOS ANGELES COUNTY IN LONG BEACH AND LOS ANGELES ON ROUTE 47 FROM OCEAN BOULEVARD TO ROUTE 103 JUNCTION AND ON ROUTE 103 FROM ROUTE 47 JUNCTION TO ANAHEIM STREET OVERHEAD |
QA Service Level | 1 (Verified on 03/29/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
dan.leon@dot.ca.gov | Daniel Leon | Resident Engineer | Caltrans RE DB |
Andy_Chen@dot.ca.gov | Andy Chen | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 121-130 of 427 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2018-10-31-2 | 10/31/2018 | 10/31/2018 | Quality Control | SMTL TM5 - Welded Hoops | View |
2018-10-31-3 | 10/31/2018 | 10/31/2018 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2018-10-31-4 | 10/31/2018 | 10/31/2018 | Quality Control | SMTL TM5 - Welded Hoops | View |
2018-10-25-7 | 10/25/2018 | 10/29/2018 | Quality Assurance | Concrete | View |
2018-10-19-2 | 10/19/2018 | 10/24/2018 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2018-10-19-9 | 10/19/2018 | 10/23/2018 | Quality Assurance | SMTL TM6 - Ductile Iron Cast Samples | View |
2018-10-16-19 | 10/16/2018 | 10/19/2018 | Quality Assurance | Concrete | View |
2018-10-17-17 | 10/17/2018 | 10/19/2018 | Quality Assurance | Concrete | View |
2018-10-09-8 | 10/09/2018 | 10/13/2018 | Quality Assurance | Concrete | View |
2018-10-09-9 | 10/09/2018 | 10/13/2018 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods