Project Details

This page displays current information for project DIME:371.

Project Information

Project IdentifiersProject ID: 371
Permit Numbers: 0207NSN0248
DIST-CO-RTE-PM02-SHA-273-10.9/11.4
Award Date07/03/2008
Closeout Date09/05/2018
Work DescriptionConstruct highway improvements from post mile 10.9 to post mile 11.4 on State Route 273 and modify signal and lighting at the intersection of State Route 273 and Canyon/Redding Rancheria Road in Redding
Location DescriptionNot set
QA Service Level2 (Verified on 06/20/2014)

Samples

Samples submitted for this project.

Job Mix Formula (JMF)

JMFs associated with this project.
JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs submitted for this project.
Declaration NumberProgram OperatorMaterial TypeVendorSubmitted by
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods