Project Details
This page displays current information for project DEA: 01262004.
Project Information
Project Identifiers | Project ID: 34 DEA: 01262004 EFIS: 0100000005 |
---|---|
DIST-CO-RTE-PM | 01-MEN-101-43.5/49.0 |
Award Date | 07/26/2012 |
Closeout Date | 08/29/2017 |
Work Description | CONSTRUCT 2 LANE HIGHWAY ON NEW ALIGNMENT. |
Location Description | NEAR WILLITS FROM 0.8 KM S HEAHL OH TO 0.8 KM N OF REYNOLDS HIGHWAY (WILLITS BYPASS) |
QA Service Level | 1 (Verified on 11/08/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
geoffrey.wright@dot.ca.gov | Geoffrey Wright | Resident Engineer | Caltrans RE DB |
christian.santos@dot.ca.gov | Christian Santos | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-3 of 3 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2013-05-03-10561948 | 05/03/2013 | 05/03/2013 | Annual Source Testing | Aggregate | View |
2013-05-06-9029812 | 05/06/2013 | 05/06/2013 | Quality Control | Aggregate | View |
2024-03-05-11 | 03/05/2024 | 03/05/2024 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods