Project Details
This page displays current information for project EFIS: 0000001155.
Project Information
Project Identifiers | Project ID: 3389 EFIS: 0000001155 Permit Numbers: 0611NDP0645 |
---|---|
DIST-CO-RTE-PM | 06-MAD-99-13.15/13.15 |
Award Date | 08/11/2011 |
Closeout Date | 07/30/2018 |
Work Description | Enter upon the State Highway Right-of-way on State Route 99 (SR-99) in Madera at and near Post Mile 13.15 to set up, maintain, and remove temporary traffic control necessary in order to construct the new bridge for the Ellis Street/Avenue 16 Overcrossing |
Location Description | SR99, Madera |
QA Service Level | 2 (Verified on 12/05/2014) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
No results found. |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods