Project Details
This page displays current information for project DIME:3030.
Project Information
Project Identifiers | Project ID: 3030 Permit Numbers: 0608NSN1013 |
---|---|
DIST-CO-RTE-PM | 06-FRE-33-61.18/61.18 |
Award Date | 11/02/2009 |
Closeout Date | 04/27/2018 |
Work Description | The proposed project includes the widening of State Route 33. In conjunction with said widening, striping, signage, pavement and concrete walk/returns are to be constructed. The installation of traffic signals are proposed at the intersection of Bass Av |
Location Description | SR33, Mendota |
QA Service Level | 2 (Verified on 11/25/2014) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
No results found. |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods