Project Details
This page displays current information for project DIME:3019.
Project Information
Project Identifiers | Project ID: 3019 Permit Numbers: 06086CD0326 0610NRW0005 |
---|---|
DIST-CO-RTE-PM | 06-FRE-180-42.639/42.639 |
Award Date | 09/18/2009 |
Closeout Date | 04/27/2018 |
Work Description | Widen the southeast corner of intersection of State Routes 145 and 180. Remove and replace existing curb, ramps, gutter and sidewalk. Restripe crosswalks in intersection. Modify signal system. Replace signal pole in southeast corner. Replace control |
Location Description | SR 180 and SR 145, Kerman |
QA Service Level | 2 (Verified on 11/21/2014) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
No results found. |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods