Project Details
This page displays current information for project DEA: 044A07U4.
Project Information
Project Identifiers | Project ID: 2347 DEA: 044A07U4 EFIS: 0400020643 COOP: 042443 |
---|---|
DIST-CO-RTE-PM | 04-ALA-580-R4.7/R8.2 |
Award Date | 06/18/2012 |
Closeout Date | 01/03/2018 |
Work Description | CONST TRUCK CLIMBING LANE, RET. WALLS, AND REHAB TRAVELED WAY. |
Location Description | ALAMEDA COUNTY IN AND NEAR LIVERMORE FROM 1.0 MILE EAST OF NORTH FLYNN ROAD TO GREENVILLE ROAD UNDERCROSSING |
QA Service Level | 1 (Verified on 07/31/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
satinder.grewal@dot.ca.gov | Satinder Grewal | Resident Engineer | Caltrans RE DB |
arsenio.escat@dot.ca.gov | Arsenio Escat | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 19 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-10-12-1 | 10/12/2023 | Quality Assurance | SMTL TM5 - Threaded Bar | View | |
2015-06-05-6 | 06/05/2015 | 06/12/2015 | Quality Control | Concrete | View |
2015-06-05-7 | 06/05/2015 | 06/12/2015 | Quality Control | Concrete | View |
2015-06-05-8 | 06/05/2015 | 06/12/2015 | Quality Control | Concrete | View |
2015-06-19-12 | 06/19/2015 | 07/02/2015 | Verification | Concrete | View |
2015-06-17-7 | 06/17/2015 | 07/02/2015 | Verification | Concrete | View |
2015-08-17-15 | 08/17/2015 | 09/10/2015 | Quality Control | Concrete | View |
2015-09-28-1 | 09/28/2015 | 10/14/2015 | Quality Control | Concrete | View |
2015-10-08-5 | 10/08/2015 | 10/14/2015 | Quality Control | Concrete | View |
2015-10-13-4 | 10/13/2015 | 10/14/2015 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods