Project Details

This page displays current information for project DEA: 033H3304.

Project Information

Project IdentifiersProject ID: 215783
DEA: 033H3304
EFIS: 0317000325
DIST-CO-RTE-PM03-YOL,SAC-50-2.5/3.2,L0.0/18.3
Award Date08/20/2021
Closeout Date01/22/2024
Work DescriptionINSTALL CMS, FIBER OPTIC CABLE SYSTEMS AND CAMERA SYSTEMS.
Location DescriptionYOLO COUNTY AND SACRAMENTO COUNTY ON ROUTE 50 FROM JEFFERSON BOULEVARD TO 1.3 MILES EAST OF FOLSOM BOULEVARD
QA Service Level1 (Verified on 07/26/2021)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
jody.phillips@dot.ca.govJody PhillipsResident EngineerCaltrans RE DB
dave.carlin@dot.ca.govDavid CarlinStructural RepresentativeCaltrans SR DB

Samples

Samples submitted for this project.

Displaying 1-10 of 129 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2022-11-01-4111/01/202211/01/2022Quality ControlConcreteView
2022-11-01-4011/01/202211/01/2022Quality ControlAggregateView
2022-11-01-3911/01/202211/01/2022Quality ControlAggregateView
2022-11-01-3111/01/202211/02/2022Quality AssuranceConcreteView
2022-10-25-2810/25/202210/25/2022Quality ControlConcreteView
2022-10-25-2710/25/202210/25/2022Quality ControlAggregateView
2022-10-25-2610/25/202210/25/2022Quality ControlAggregateView
2022-10-25-2010/25/202210/27/2022Quality AssuranceConcreteView
2022-10-25-1910/25/202210/27/2022Quality AssuranceConcreteView
2022-10-25-1810/25/202210/27/2022Quality AssuranceConcreteView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods