Project Details
This page displays current information for project DEA: 032H6304.
Project Information
Project Identifiers | Project ID: 215777 DEA: 032H6304 EFIS: 0317000166 |
---|---|
DIST-CO-RTE-PM | 03-BUT-162-18.4/19.9 |
Award Date | 08/04/2021 |
Closeout Date | 02/22/2024 |
Work Description | PLACE RUBBERIZED HMA AND ROADWAY EXCAVATION. |
Location Description | BUTTE COUNTY IN AND NEAR OROVILLE FROM FOOTHILL BOULEVARD TO GOLD COUNTRY CASINO ENTRANCE |
QA Service Level | 1 (Verified on 06/01/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
dwayne.grandy@dot.ca.gov | Dwayne Grandy | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 11-16 of 16 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-09-29-45 | 09/29/2022 | 11/15/2022 | Department Acceptance | Asphalt Binder | View |
2022-09-30-56 | 09/30/2022 | 11/14/2022 | Department Acceptance | Asphalt Rubber Binder | View |
2022-09-30-57 | 09/30/2022 | 11/15/2022 | Department Acceptance | Asphalt Binder | View |
2022-10-01-7 | 10/01/2022 | 11/01/2022 | Department Acceptance | Asphaltic Emulsion | View |
2022-10-01-8 | 10/01/2022 | 11/01/2022 | Department Acceptance | Asphaltic Emulsion | View |
2023-08-01-9 | 08/01/2023 | 08/01/2023 | Department Acceptance | Asphaltic Emulsion | View |
Go to page:
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods