Project Details
This page displays current information for project DEA: 050N72U4.
Project Information
Project Identifiers | Project ID: 215753 DEA: 050N72U4 EFIS: 0520000169 |
---|---|
DIST-CO-RTE-PM | 05-SB-101-4.4/R7.7 |
Award Date | 03/01/2021 |
Closeout Date | Not set |
Work Description | Please cc Office Engineer Ni Nyoman Paul on reports sent to RE and SR. Construct High Occupancy Vehicle (HOV) lanes on U.S. Route 101 and rehabilitation - Segment 4B. |
Location Description | 101 freeway in Summerland, CA |
QA Service Level | 1 (Verified on 05/06/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
luobao.cai@dot.ca.gov | Luobao Cai | Resident Engineer | Caltrans RE DB |
emiliano.berntsen@dot.ca.gov | Emiliano Berntsen | Structural Representative | Caltrans SR DB |
christopher.m.mcdermott@dot.ca.gov | Christopher McDermott | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 151-160 of 1226 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2023-10-31-91 | 10/31/2023 | 11/01/2023 | Quality Control | Concrete | View |
2023-10-27-70 | 10/27/2023 | 10/27/2023 | Quality Assurance | Concrete | View |
2023-10-27-82 | 10/27/2023 | 10/27/2023 | Quality Assurance | Aggregate | View |
2023-10-26-58 | 10/26/2023 | 10/27/2023 | Quality Assurance | Concrete | View |
2023-10-26-87 | 10/26/2023 | 10/26/2023 | Quality Assurance | Aggregate | View |
2023-10-26-88 | 10/26/2023 | 10/26/2023 | Quality Assurance | Aggregate | View |
2023-10-25-4 | 10/25/2023 | 10/25/2023 | Quality Assurance | Aggregate | View |
2023-10-25-5 | 10/25/2023 | 10/25/2023 | Quality Assurance | Concrete | View |
2023-10-25-6 | 10/25/2023 | 10/25/2023 | Quality Assurance | Aggregate | View |
2023-10-25-7 | 10/25/2023 | 10/25/2023 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods