Project Details
This page displays current information for project DEA: 010K5704.
Project Information
Project Identifiers | Project ID: 215721 DEA: 010K5704 EFIS: 0120000118 |
---|---|
DIST-CO-RTE-PM | 01-HUM-36-40.5/45.7 |
Award Date | 06/04/2021 |
Closeout Date | 07/21/2022 |
Work Description | COLD PLANE AC PAVEMENT, PLACE RHMA-G AND TRAFFIC STRIPING. |
Location Description | HUMBOLDT COUNTY NEAR DINSMORE FROM VAN DUZEN RIVER BRIDGE TO TRINITY COUNTY LINE |
QA Service Level | 1 (Verified on 04/30/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
joaquin.s.rodriguez@dot.ca.gov | Joaquin Rodriguez | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-8 of 8 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-05-23-22 | 05/23/2022 | 05/25/2022 | Department Acceptance | Asphalt Binder | View |
2022-04-26-54 | 04/26/2022 | 05/23/2022 | Department Acceptance | Asphalt Binder | View |
2022-05-18-28 | 05/18/2022 | 05/19/2022 | Department Acceptance | Asphalt Rubber Binder | View |
2022-04-26-28 | 04/26/2022 | 04/29/2022 | Department Acceptance | Asphalt Binder | View |
2022-04-04-16 | 04/04/2022 | 04/08/2022 | Department Acceptance | Asphalt Binder | View |
2022-03-10-21 | 03/10/2022 | 03/23/2022 | Department Acceptance | Asphalt Binder | View |
2022-03-10-17 | 03/10/2022 | 03/18/2022 | Verification | Asphalt Binder | View |
2021-11-18-14 | 11/18/2021 | 11/29/2021 | Quality Assurance | Asphalt Binder | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods