This page displays current information for project DEA: 051N3504.
Project Information
Project Identifiers | Project ID: 215710 DEA: 051N3504 EFIS: 0520000173 |
---|---|
DIST-CO-RTE-PM | 05-SLO-101-37.8/46.0, 37.0/46.0 |
Award Date | 06/09/2021 |
Closeout Date | 09/06/2022 |
Work Description | Replace concrete pavement with precast concrete panels. |
Location Description | Near Atascadero on US 101 from 0.1 mile south of Route 58/10 separation to Traffic Way. |
QA Service Level | 1 (Verified on 07/06/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
drussu@mnsengineers.com | Dean Russu | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 74 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-04-04-25 | 04/04/2022 | 04/13/2022 | Department Acceptance | Asphalt Binder | View |
2022-01-26-28 | 01/26/2022 | 01/27/2022 | Quality Control | Concrete | View |
2022-01-25-47 | 01/25/2022 | 01/26/2022 | Quality Control | Concrete | View |
2022-01-25-46 | 01/25/2022 | 01/26/2022 | Quality Control | Concrete | View |
2022-01-24-53 | 01/24/2022 | 01/25/2022 | Quality Control | Concrete | View |
2022-01-21-36 | 01/21/2022 | 01/24/2022 | Quality Control | Concrete | View |
2022-01-21-35 | 01/21/2022 | 01/24/2022 | Quality Control | Concrete | View |
2022-01-19-25 | 01/19/2022 | 01/20/2022 | Quality Control | Concrete | View |
2022-01-19-24 | 01/19/2022 | 01/20/2022 | Quality Control | Concrete | View |
2022-01-18-23 | 01/18/2022 | 01/19/2022 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods