Project Details
This page displays current information for project DIME:215565.
Project Information
Project Identifiers | Project ID: 215565 Permit Numbers: 0320AOP1078 |
---|---|
DIST-CO-RTE-PM | 03-ED-50-16.4/16.8 |
Award Date | 09/15/2020 |
Closeout Date | Not set |
Work Description | The WPI Phase 2.2 Project will construct the east bound on-ramp from Ray Lawyer Drive onto US 50 within the city of Placerville |
Location Description | N/A, Placerville |
QA Service Level | 2 (Verified on 04/19/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods