Project Details
This page displays current information for project DEA: 051N4104.
Project Information
Project Identifiers | Project ID: 215541 DEA: 051N4104 EFIS: 0521000015 |
---|---|
DIST-CO-RTE-PM | 05-MON-1-30.1, 27.2/27.6, 29.6/36.8, 27.2/27.6/36.8, 27.2/27.6, 29.6, 36.8 |
Award Date | 01/28/2021 |
Closeout Date | 09/02/2022 |
Work Description | Replace culvert-Repair roadway washout, remove and dispose of debris flow materials, unplug and repair culverts, repair other rain related damage, provide temporary traffic control |
Location Description | Big Sur coast, Rat Creek |
QA Service Level | 1 (Verified on 03/12/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
rick.silva@dot.ca.gov | Rick Silva | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods