Project Details
This page displays current information for project DEA: 120S2004.
Project Information
Project Identifiers | Project ID: 215523 DEA: 120S2004 EFIS: 1219000105 |
---|---|
DIST-CO-RTE-PM | 12-ORA-22,57-R2.7/R11.9,18.8 |
Award Date | 04/12/2021 |
Closeout Date | 09/08/2022 |
Work Description | PLACE POLYESTER CONCRETE, REPLACE JOINT SEALS AND TREAT BRIDGE DECK. |
Location Description | ORANGE COUNTY AT VARIOUS LOCATIONS ON ROUTE 22 FROM GARDEN GROVE BOULEVARD UNDERCROSSING TO GLASSELL STREET UNDERCROSSING AND ON ROUTE 57 AT BASTANCHURY ROAD UNDERCROSSING |
QA Service Level | 1 (Verified on 05/20/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
jay.joubeen@dot.ca.gov | Jay Joubeen | Resident Engineer | Caltrans RE DB |
Theodore_Pham@dot.ca.gov | Theodore Pham | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-2 of 2 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-06-18-7 | 06/18/2021 | 06/18/2021 | Quality Control | Methacrylate | View |
2021-06-18-29 | 06/18/2021 | 06/21/2021 | Quality Control | Methacrylate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods