Project Details
This page displays current information for project DEA: 074W7704.
Project Information
Project Identifiers | Project ID: 215518 DEA: 074W7704 EFIS: 0719000274 |
---|---|
DIST-CO-RTE-PM | 07-LA-60-R0.6/R29.4 |
Award Date | 04/14/2021 |
Closeout Date | 10/06/2022 |
Work Description | METHATCRYLATE DECK, REPLACE JOINT SEAL, POLYESTER CONCRETE OVERLAY. |
Location Description | LOS ANGELES COUNTY AT VARIOUS LOCATIONS FROM ROUTE 60/5 SEPARATION TO GAREY AVENUE UNDERCROSSING |
QA Service Level | 1 (Verified on 08/17/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
No results found. |
Samples
Samples submitted for this project.
Displaying 1-10 of 10 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-03-22-19 | 03/22/2022 | 04/01/2022 | Department Acceptance | Hot Mix Asphalt | View |
2022-03-21-60 | 03/21/2022 | 04/27/2022 | Department Acceptance | Hot Mix Asphalt | View |
2022-03-22-24 | 03/22/2022 | 04/27/2022 | Department Acceptance | Hot Mix Asphalt | View |
2022-03-14-50 | 03/14/2022 | 05/24/2022 | Department Acceptance | Hot Mix Asphalt | View |
2022-03-14-51 | 03/14/2022 | 05/24/2022 | Department Acceptance | Hot Mix Asphalt | View |
2022-03-14-52 | 03/14/2022 | 05/24/2022 | Department Acceptance | Hot Mix Asphalt | View |
2021-11-03-22 | 11/03/2021 | 11/03/2021 | Quality Control | Polyester | View |
2022-01-06-16 | 01/06/2022 | 01/06/2022 | Quality Control | Polyester | View |
2022-01-10-8 | 01/10/2022 | 01/10/2022 | Quality Control | Polyester | View |
2022-02-21-24 | 02/21/2022 | 02/22/2022 | Quality Control | Polyester | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods