Project Details
This page displays current information for project DEA: 040A0204.
Project Information
Project Identifiers | Project ID: 215486 DEA: 040A0204 EFIS: 0400000129 |
---|---|
DIST-CO-RTE-PM | 04-SON-1-15-15.7 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Construct roadway and bridge with structural concrete and CIDH piling |
Location Description | District-County-Route-Post Mile: 04-Son-1-R15.0/R15.7 |
QA Service Level | 1 (Verified on 04/08/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Fabio.LaSerna@dot.ca.gov | Fabio La Serna | Resident Engineer | Caltrans RE DB |
bunma.nou@dot.ca.gov | Bunma Nou | Structural Representative | Caltrans SR DB |
waqas.ather@dot.ca.gov | Waqas Ather | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 101-110 of 191 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-09-16-33 | 09/16/2021 | 09/16/2021 | Quality Control | Aggregate | View |
2021-09-16-34 | 09/16/2021 | 09/16/2021 | Quality Control | Concrete | View |
2021-09-14-25 | 09/14/2021 | 09/14/2021 | Quality Control | Aggregate | View |
2021-09-14-26 | 09/14/2021 | 09/14/2021 | Quality Control | Aggregate | View |
2021-09-14-27 | 09/14/2021 | 09/14/2021 | Quality Control | Concrete | View |
2021-09-24-32 | 09/24/2021 | 09/24/2021 | Quality Control | Concrete | View |
2021-09-25-5 | 09/25/2021 | 09/25/2021 | Quality Control | Concrete | View |
2021-10-19-2 | 10/19/2021 | Quality Control | SMTL TM5 - Welded Hoops | View | |
2021-10-01-22 | 10/01/2021 | 10/01/2021 | Quality Control | Concrete | View |
2021-10-02-2 | 10/02/2021 | 10/02/2021 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
Displaying 1-1 of 1 result.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
JMF3511-286-2022-42 | Submittal In Progress | CT D04 - Petaluma Field Laboratory | 12/16/2022 | View |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods