Project Details
This page displays current information for project DEA: 040A0204.
Project Information
Project Identifiers | Project ID: 215486 DEA: 040A0204 EFIS: 0400000129 |
---|---|
DIST-CO-RTE-PM | 04-SON-1-15-15.7 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Construct roadway and bridge with structural concrete and CIDH piling |
Location Description | District-County-Route-Post Mile: 04-Son-1-R15.0/R15.7 |
QA Service Level | 1 (Verified on 04/08/2022) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Fabio.LaSerna@dot.ca.gov | Fabio La Serna | Resident Engineer | Caltrans RE DB |
bunma.nou@dot.ca.gov | Bunma Nou | Structural Representative | Caltrans SR DB |
waqas.ather@dot.ca.gov | Waqas Ather | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 191 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-11-24-34 | 11/24/2021 | 12/16/2021 | Annual Source Testing | Aggregate | View |
2021-11-24-35 | 11/24/2021 | 12/16/2021 | Annual Source Testing | Aggregate | View |
2023-03-03-8 | 03/03/2023 | 03/03/2023 | Department Acceptance | Roadway/Bridge Surface | View |
2021-07-06-24 | 07/06/2021 | 07/08/2021 | Quality Assurance | Concrete | View |
2021-07-21-9 | 07/21/2021 | 07/23/2021 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2021-07-21-10 | 07/21/2021 | 07/23/2021 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2021-07-21-11 | 07/21/2021 | 07/23/2021 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2021-07-22-1 | 07/22/2021 | 07/26/2021 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2021-07-22-2 | 07/22/2021 | 07/26/2021 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2021-08-16-13 | 08/16/2021 | 08/20/2021 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
Displaying 1-1 of 1 result.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
JMF3511-286-2022-42 | Submittal In Progress | CT D04 - Petaluma Field Laboratory | 12/16/2022 | View |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods