Project Details
This page displays current information for project DEA: 040A0204.
Project Information
Project Identifiers | Project ID: 215486 DEA: 040A0204 EFIS: 0400000129 |
---|---|
DIST-CO-RTE-PM | 04-SON-1-15-15.7 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Construct roadway and bridge with structural concrete and CIDH piling |
Location Description | District-County-Route-Post Mile: 04-Son-1-R15.0/R15.7 |
QA Service Level | 1 (Verified on 04/08/2022) |
Samples
Samples submitted for this project.
Displaying 11-20 of 68 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-08-16-16 | 08/16/2021 | 08/20/2021 | Quality Assurance | Concrete | View |
2021-09-10-9 | 09/10/2021 | 09/14/2021 | Quality Assurance | SMTL TM5 - Couplers | View |
2021-09-14-25 | 09/14/2021 | 09/14/2021 | Quality Control | Aggregate | View |
2021-09-14-26 | 09/14/2021 | 09/14/2021 | Quality Control | Aggregate | View |
2021-09-14-27 | 09/14/2021 | 09/14/2021 | Quality Control | Concrete | View |
2021-09-14-3 | 09/14/2021 | 09/16/2021 | Quality Assurance | Concrete | View |
2021-09-16-32 | 09/16/2021 | 09/16/2021 | Quality Control | Aggregate | View |
2021-09-16-33 | 09/16/2021 | 09/16/2021 | Quality Control | Aggregate | View |
2021-09-16-34 | 09/16/2021 | 09/16/2021 | Quality Control | Concrete | View |
2021-09-20-1 | 09/20/2021 | 09/28/2021 | Quality Control | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted by | DIME Sample ID | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs submitted for this project.
Declaration Number | Program Operator | Material Type | Vendor | Submitted by |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods