Project Details
This page displays current information for project DEA: 040A0204.
Project Information
Project Identifiers | Project ID: 215486 DEA: 040A0204 EFIS: 0400000129 |
---|---|
DIST-CO-RTE-PM | 04-SON-1-15-15.7 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Construct roadway and bridge with structural concrete and CIDH piling |
Location Description | District-County-Route-Post Mile: 04-Son-1-R15.0/R15.7 |
QA Service Level | 1 (Verified on 04/08/2022) |
Samples
Samples submitted for this project.
Displaying 41-50 of 68 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-10-05-14 | 10/05/2021 | 10/07/2021 | Quality Assurance | Concrete | View |
2021-10-05-38 | 10/05/2021 | 10/05/2021 | Quality Control | Concrete | View |
2021-10-02-2 | 10/02/2021 | 10/02/2021 | Quality Control | Concrete | View |
2021-10-01-22 | 10/01/2021 | 10/01/2021 | Quality Control | Concrete | View |
2021-09-25-5 | 09/25/2021 | 09/25/2021 | Quality Control | Concrete | View |
2021-09-25-9 | 09/25/2021 | 10/07/2021 | Quality Assurance | Concrete | View |
2021-09-24-32 | 09/24/2021 | 09/24/2021 | Quality Control | Concrete | View |
2021-09-21-28 | 09/21/2021 | 09/29/2021 | Quality Assurance | Concrete | View |
2021-09-20-1 | 09/20/2021 | 09/28/2021 | Quality Control | SMTL TM3 - Fastener Assembly | View |
2021-09-16-32 | 09/16/2021 | 09/16/2021 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted by | DIME Sample ID | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs submitted for this project.
Declaration Number | Program Operator | Material Type | Vendor | Submitted by |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods