Project Details

This page displays current information for project DEA: 120N5804.

Project Information

Project IdentifiersProject ID: 215471
DEA: 120N5804
EFIS: 1214000063
MINOR: 12A1847
DIST-CO-RTE-PM12-ORA-57-15.0/15.5
Award DateNot set
Closeout Date07/02/2024
Work DescriptionTo improve Traffic Operation by Installing an overhead guide sign and roadside signs informing motorists of an upcoming mandatory exit ramp
Location DescriptionOrange County in the City of Anaheim, on southbound Route 57 between Lincoln Ave to E. La Palma Ave Undercrossing
QA Service Level1 (Verified on 02/12/2021)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
Fathi.Safadi@dot.ca.govFathi SafadiResident EngineerCaltrans RE DB
charles.leong@dot.ca.govcharles leongStructural RepresentativeCaltrans SR DB

Samples

Samples submitted for this project.

Displaying 1-10 of 11 results.
DIME Sample IDSample Taken DateSample Received DateSample TypeMaterial TypeLink
   
2021-09-01-409/01/202109/07/2021Quality AssuranceSMTL TM3 - Fastener AssemblyView
2021-09-01-509/01/202109/07/2021Quality AssuranceSMTL TM3 - Fastener AssemblyView
2021-09-01-109/01/202109/09/2021Quality AssuranceSMTL TM3 - Fastener AssemblyView
2021-09-01-209/01/202109/09/2021Quality AssuranceSMTL TM3 - Fastener AssemblyView
2021-09-01-309/01/202109/09/2021Quality AssuranceSMTL TM3 - Fastener AssemblyView
2021-09-01-609/01/202109/09/2021Quality AssuranceSMTL TM3 - Fastener AssemblyView
2021-09-01-709/01/202109/09/2021Quality AssuranceSMTL TM3 - Fastener AssemblyView
2021-09-01-809/01/202109/09/2021Quality AssuranceSMTL TM3 - Fastener AssemblyView
2021-09-01-909/01/202109/09/2021Quality AssuranceSMTL TM3 - Fastener AssemblyView
2021-09-01-1009/01/202109/09/2021Quality AssuranceSMTL TM3 - Fastener AssemblyView

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods