Project Details
This page displays current information for project DEA: 06360244.
Project Information
Project Identifiers | Project ID: 215425 DEA: 06360244 EFIS: 0613000005 |
---|---|
DIST-CO-RTE-PM | 06-TUL-99-30.6/35.2 |
Award Date | 04/23/2021 |
Closeout Date | Not set |
Work Description | Widen Freeway & Bridge Construction (Concrete Bridge) |
Location Description | Not set |
QA Service Level | 1 (Verified on 11/01/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Javier.Huerta@dot.ca.gov | Javier Huerta | Resident Engineer | Caltrans RE DB |
ramandeep.guraya@dot.ca.gov | Ramandeep Guraya | Structural Representative | Caltrans SR DB |
justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 41-50 of 752 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-11-08-14 | 11/08/2022 | 11/22/2022 | Acceptance | Asphaltic Emulsion | View |
2023-02-16-58 | 02/16/2023 | 02/17/2023 | Acceptance | Concrete | View |
2023-02-16-59 | 02/16/2023 | 02/17/2023 | Acceptance | Concrete | View |
2023-03-22-10 | 03/22/2023 | 03/22/2023 | Acceptance | Aggregate | View |
2023-03-17-40 | 03/17/2023 | 03/18/2023 | Acceptance | Concrete | View |
2023-03-20-9 | 03/20/2023 | 03/21/2023 | Acceptance | Concrete | View |
2023-04-13-22 | 04/13/2023 | 04/14/2023 | Acceptance | Concrete | View |
2023-04-13-23 | 04/13/2023 | 04/14/2023 | Acceptance | Concrete | View |
2023-04-13-24 | 04/13/2023 | 04/14/2023 | Acceptance | Concrete | View |
2023-03-22-20 | 03/22/2023 | 03/23/2023 | Acceptance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods