Project Details
This page displays current information for project DEA: 042K9504.
Project Information
Project Identifiers | Project ID: 215421 DEA: 042K9504 EFIS: 0417000057 |
---|---|
DIST-CO-RTE-PM | 04-ALA-580-14.4/14.4 |
Award Date | 02/02/2023 |
Closeout Date | Not set |
Work Description | CONSTRUCT MATERIAL TESTING LABORATORY BUILDING. |
Location Description | ALAMEDA COUNTY IN LIVERMORE AT 2201 KITTY HAWK ROAD |
QA Service Level | 1 (Verified on 01/06/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
amir-fardin.sadeghi-nedjad@dot.ca.gov | Amir-Fardin Sadeghi-Nedjad | Resident Engineer | Caltrans RE DB |
john.parecadan@dot.ca.gov | John Parecadan | Structural Representative | Caltrans SR DB |
dylan.larose@dot.ca.gov | Dylan Larose | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 24 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2020-12-29-2 | 12/29/2020 | 01/06/2021 | Per Request | Soil | View |
2020-12-30-10 | 12/30/2020 | 01/06/2021 | Per Request | Soil | View |
2023-05-25-6 | 05/25/2023 | 05/31/2023 | Department Acceptance | SMTL TM3 - Fastener Assembly | View |
2023-06-08-5 | 06/08/2023 | 06/09/2023 | Department Acceptance | SMTL TM3 - Fastener Assembly | View |
2023-06-08-6 | 06/08/2023 | 06/09/2023 | Department Acceptance | SMTL TM3 - Fastener Assembly | View |
2023-06-26-5 | 06/26/2023 | 06/27/2023 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2023-07-05-7 | 07/05/2023 | Quality Assurance | SMTL TM3 - Fastener Assembly | View | |
2023-07-06-61 | 07/06/2023 | 08/01/2023 | Quality Assurance | Concrete | View |
2023-07-21-46 | 07/21/2023 | 08/01/2023 | Quality Assurance | Concrete | View |
2023-08-04-16 | 08/04/2023 | Department Acceptance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Displaying 1-6 of 6 results.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
4790372675.101.1 | Carbon Steel Rebar | Nucor Steel, Incorporated - Plymouth | Walsh Construction Company (Dominic Fung) | 7930 LB |
4790372675.101.1 | Carbon Steel Rebar | Nucor Steel, Incorporated - Plymouth | Walsh Construction Company (Dominic Fung) | 8344 LB |
4790372675.101.1 | Carbon Steel Rebar | Nucor Steel, Incorporated - Plymouth | Walsh Construction Company (Dominic Fung) | 7920 LB |
4790372675.101.1 | Carbon Steel Rebar | Nucor Steel, Incorporated - Plymouth | Walsh Construction Company (Laura Abarca) | 1454 lbs |
4790372675.101.1 | Carbon Steel Rebar | Nucor Steel, Incorporated - Plymouth | Walsh Construction Company (Laura Abarca) | 1454 lbs |
4790372675.101.1 | Carbon Steel Rebar | Nucor Steel, Incorporated - Plymouth | Walsh Construction Company (Laura Abarca) | 1454 lbs |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods