Project Details
This page displays current information for project DEA: 042K8404.
Project Information
Project Identifiers | Project ID: 215396 DEA: 042K8404 EFIS: 0417000031 |
---|---|
DIST-CO-RTE-PM | 04-SOL-29,80-0.0,0.8/1.6 |
Award Date | 03/26/2021 |
Closeout Date | 02/16/2024 |
Work Description | HMA, STRUCTURAL CONCRETE, CIDH PILING AND REBAR. |
Location Description | SOLANO COUNTY IN VALLEJO AT ROUTE 80/29 SEPARATION AND ON ROUTE 80 FROM 0.2 MILE NORTH OF CARQUINEZ BRIDGE TOLL PLAZA TO 0.3 MILE SOUTH OF MAGAZINE STREET OVERCROSSING |
QA Service Level | 1 (Verified on 01/25/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
noel.aquino@dot.ca.gov | Noel Aquino | Resident Engineer | Caltrans RE DB |
angelo.perez@dot.ca.gov | Angelo Perez | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 311-320 of 320 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-08-27-5 | 08/27/2021 | 09/01/2021 | Quality Assurance | SMTL TM5 - Couplers | View |
2021-08-18-23 | 08/18/2021 | 08/23/2021 | Quality Assurance | Concrete | View |
2021-07-29-26 | 07/29/2021 | 08/06/2021 | Quality Assurance | SMTL TM1 - Elastomeric Bearing Pad | View |
2021-06-17-7 | 06/17/2021 | Quality Control | SMTL TM5 - Welded Hoops | View | |
2021-06-17-6 | 06/17/2021 | 06/22/2021 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2021-06-17-5 | 06/17/2021 | 06/24/2021 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2021-06-17-4 | 06/17/2021 | 06/24/2021 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2021-06-16-2 | 06/16/2021 | Quality Control | SMTL TM5 - Welded Hoops | View | |
2021-06-16-1 | 06/16/2021 | 06/18/2021 | Quality Assurance | SMTL TM5 - Welded Hoops | View |
2021-06-03-22 | 06/03/2021 | 06/08/2021 | Quality Assurance | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods