Project Details
This page displays current information for project DEA: 060X2704.
Project Information
Project Identifiers | Project ID: 215374 DEA: 060X2704 EFIS: 0618000048 |
---|---|
DIST-CO-RTE-PM | 06-FRE-5-37.2/48.8 |
Award Date | 05/11/2022 |
Closeout Date | Not set |
Work Description | PAVEMENT REHABILITATION |
Location Description | FROM 1.9 MILES NORTH OF THREE ROCKS ROAD UC TO 0.2 MILES SOUTH OF PANOCHE ROAD OC |
QA Service Level | 1 (Verified on 12/16/2020) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Cary.Cruz@dot.ca.gov | Cary Cruz | Resident Engineer | Caltrans RE DB |
justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 31-40 of 67 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2022-10-17-56 | 10/17/2022 | 10/18/2022 | Quality Control | Concrete | View |
2022-10-14-61 | 10/14/2022 | 10/17/2022 | Quality Control | Concrete | View |
2022-10-13-65 | 10/13/2022 | 10/14/2022 | Quality Control | Concrete | View |
2022-10-12-56 | 10/12/2022 | 10/13/2022 | Quality Control | Concrete | View |
2022-10-11-66 | 10/11/2022 | 10/12/2022 | Quality Control | Concrete | View |
2022-10-10-81 | 10/10/2022 | 10/11/2022 | Quality Control | Concrete | View |
2022-10-07-66 | 10/07/2022 | 10/10/2022 | Quality Control | Concrete | View |
2022-10-06-79 | 10/06/2022 | 10/07/2022 | Quality Control | Concrete | View |
2022-10-05-76 | 10/05/2022 | 10/06/2022 | Quality Control | Concrete | View |
2022-10-04-81 | 10/04/2022 | 11/09/2022 | Quality Assurance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods