Project Details
This page displays current information for project DEA: 112N0454.
Project Information
Project Identifiers | Project ID: 215360 DEA: 112N0454 EFIS: 1118000198 |
---|---|
DIST-CO-RTE-PM | 11-SD-94-30.0/39.0 |
Award Date | 02/18/2021 |
Closeout Date | 08/02/2022 |
Work Description | PLACING CHIP SEAL, SLURRY SEAL, SHOULDER BACKING AND STRIPING. |
Location Description | SAN DIEGO COUNTY NEAR DULZURA AND BARRETT JUNCTION FROM 0.9 MILE EAST OF GRANDE CREEK BRIDGE TO ROUTE 188. |
QA Service Level | 1 (Verified on 02/08/2021) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Benjamin.Haney@dot.ca.gov | Benjamin Haney | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 11-20 of 20 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2021-11-03-48 | 11/03/2021 | 11/26/2021 | Quality Assurance | Aggregate | View |
2021-10-31-6 | 10/31/2021 | 11/26/2021 | Quality Control | Aggregate | View |
2021-10-30-9 | 10/30/2021 | 11/26/2021 | Quality Control | Aggregate | View |
2021-10-27-23 | 10/27/2021 | 11/10/2021 | Verification | Crumb Rubber Modifier | View |
2021-10-27-24 | 10/27/2021 | 11/10/2021 | Verification | Crumb Rubber Modifier | View |
2021-10-27-37 | 10/27/2021 | 11/26/2021 | Quality Control | Aggregate | View |
2021-10-27-38 | 10/27/2021 | 11/26/2021 | Quality Control | Hot Mix Asphalt | View |
2021-10-27-39 | 10/27/2021 | 11/26/2021 | Quality Control | Aggregate | View |
2021-10-27-40 | 10/27/2021 | 11/26/2021 | Quality Control | Hot Mix Asphalt | View |
2021-06-29-41 | 06/29/2021 | 07/30/2021 | Quality Control | Aggregate | View |
Go to page:
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods